PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed pipe hangers at the 4th floor Facing East.jpg laying out block along column line 3.3 between H-K.jpg Laying out block at the 2nd floor UCIA Facing North.jpg STarted installing the main raiser at the 3rd floor Facing North.jpg Storm piping for the low roof Facing South.jpg Waste and vent piping at the 4th floor Facing North.jpg
Previous pageNext page Storm piping for the low roof Facing South
Storm piping for the low roof Facing South